Work begins on Garth Lane footbridge in Grimsby
It'll be shut for 6 months
Work's starting on Garth Lane footbridge in Grimsby today.
It'll be shut for 6 months, so the existing bridge can be removed and replaced with a 'showcase' five-metre-wide structure.
Its part of regeneration works.
A new tiered step area down to the river is also being installed.