Wokingham level crossings to be closed for upgrade work
Wokingham station and Easthampsted Road crossings to be closed for several weeks
Railway reliability upgrades by Network Rail will mean temporary closures of the level crossings at Wokingham station and Easthampstead Road (Star Lane) from 26 January to 19 February.
As part of the upgrade work to support the reliability of the railway, engineers will also need to complete resignalling and level crossing upgrade work between Reading, Bracknell and Guilford during the February half term (Saturday 10 to Sunday 18 February) which means that passengers will need to plan ahead and check before they travel.
Buses will replace South Western Railway (SWR) and Great Western Railway (GWR) trains between Reading, Bracknell and Guildford, extending to Ascot and Aldershot on some weekends.
From Saturday 10 to Sunday 18 February, Network Rail will be completing resignalling work in the Wokingham area, installing 43 new signals.
The project team are upgrading four level crossings; two at Wokingham station and two on Easthampstead Road (Star Lane).
At Wokingham station, a manually controlled barrier will be upgraded with CCTV monitors helping to keep railway and road users safe. The crossing will need to be closed completely from 22:00 on 26 January until 04:00 on 19 February.
At Easthampstead Road (Star Lane), engineers will complete work to modernise the level crossings, installing new equipment that will extend the life of the crossing by 30 years. The crossing will need to be closed completely from 22:00 on 2 February until 04:00 on 19 February.
This work is the conclusion of Network Rail’s £116m Feltham and Wokingham re-signalling programme which, over the past four years, has seen upgrades to key signalling equipment and level crossings controlled by the Feltham Area Signalling Centre and Wokingham Signal Box, which jointly cover 80 miles of railway and 500 separate pieces of signalling equipment in key areas of the South Western Railway (SWR) network including Feltham, Hounslow, Shepperton, Twickenham, Windsor & Eton Riverside and Wokingham.
While the railway is closed, engineers will also be working at Wokingham Junction to upgrade switches and crossings as well as completing routine maintenance and structure examination to make best use of the railway being closed for nine days.
Tom McNamee, Network Rail’s Wessex route infrastructure director, said:
“These works are critical to us being able to deliver a safe, modern and reliable service for customers travelling on our network between Reading, Bracknell and Guildford.
“There’s never a good time to close the railway, and we know that level crossing closures in Wokingham will be disruptive to local road users. However, delivering the bulk of these works during the half term break, when fewer people travel by rail and the schools are closed, helps us minimise the disruption to our customers who rely on this important stretch of railway.
“We’re grateful to customers and local residents living alongside the railway for their patience and understanding while we continue upgrading the railway.”
A spokesperson for South Western Railway commented:
“We would like to remind customers to check before travelling ahead of these vital improvements, as buses will replace our train services between Reading, Bracknell and Ascot at differing times between Saturday 10 and Sunday 18 February.
“Customers heading to Twickenham for the England v Wales rugby fixture on Saturday 10 February should also plan ahead.
“We’re very grateful for our customers’ patience as this work is carried out.”
Great Western Railway station manager for the North Downs line Andrew Gallaugher said:
"As we continue to invest in the railway, this work is really important to ensure we can maintain and improve resilience.
"Buses will replace trains between Reading and Guildford between Saturday 10 and Sunday 18 February; journeys will take slightly longer, and we urge those travelling to check their journey beforehand.
"Thank you in advance for your patience and understanding."
Travel information:
During the closure, SWR will be running rail replacement bus services on the following routes:
Saturday 10 February
Bracknell to Reading
Sunday 11 February
Ascot to Reading
Weybridge to Aldershot
Aldershot to Guildford
Monday 12 to Friday 16 February
Bracknell to Reading
Saturday 17 February (before 7:30pm)
Bracknell to Reading
Saturday 17 February (after 7:30pm)
Ascot to Reading
Sunday 18 February
Ascot to Reading
Aldershot to Guildford
Great Western Railway will be running rail replacement bus services on the following route:
Saturday 10 to Sunday 18 February
Reading to Guildford